Starting point
We understand the segment's challenges
Where costs and risks really arise in this environment, and why you cannot see them without metering.
Flat-rate allocation without metering
Without sub-metering, costs are split evenly, regardless of the actual consumption of each building or unit.
No central overview
The manager runs several buildings with no way to compare their consumption or track trends over time.
Installation without disrupting operation
In apartment buildings, metering has to be installed without restricting residents and in line with standards.
Room to grow
The system has to be scalable: electricity today, heat, water or another building tomorrow.
Project scope
What we deployed on the project
- 7 metering points in 3 separate apartment buildings
- 12 devices installed
- Electricity meters with Modbus RTU communication, digital reading
- Integration into the existing sub-distribution boards without major changes
- Delivered in line with STN 33 2000, with inspection and functional testing

Results · real data from the deployment
Measurable impact
The figures come straight from the deployed monitoring and analytics system.
7
Metering points
3
Apartment buildings
12
Devices
Online
Real-time data
For the first time, the manager has a real overview of consumption by building
Metering installed without disrupting the buildings’ operation
A scalable system, easily extended to further buildings or utilities
The platform enables forecasting and comparing consumption over time
Concrete benefits · real findings
What the system delivered in practice
Fair cost allocation instead of a flat rate
Sub-metering gave the manager real consumption values by building, the basis for allocating costs according to actual use, not at a flat rate.
No disruption to the apartment buildings
We integrated the metering into the existing sub-distribution boards without restricting residents. The platform is ready to scale to further buildings and utilities: heat, water, gas.
Your challenges · our answers
What it means for an apartment building manager
Flat-rate allocation with no data on actual consumption
Sub-metering → fair cost allocation based on real values
No central overview across the buildings
A central dashboard, the consumption of all buildings in one place
The installation must not restrict residents
Integration into existing switchboards, no disruption to operation
The system has to grow with the manager
A scalable platform, further buildings and utilities at any time
Why Nidex Technology
Three reasons, each proven in practice
End-to-end responsibility
From design, hardware supply and installation to data integration, inspections and support. One supplier, one point of responsibility.
Technical precision and standards
We design in line with the Slovak standards STN 33 2000 and STN EN 61439. We issue statutory inspection and test reports (OPOS) with our own staff.
Based in Central Europe
We are based in Nitra, Slovakia, about two hours from Vienna and Budapest, and know the local legislation. Fast response, one team from design to service.
Proposed next steps
Three steps from a meeting to the first results
- 01
Technical meeting
A visit to the selected building. We define the scope, priority locations and constraints.
- 02
Indicative quote
An indicative price based on the agreed scope. Presentation of the technical design.
- 03
Pilot project
Deployment in one building. Verifying functionality, integration and training the operators.
Conclusion
Why it makes sense
The project gave the manager of a residential portfolio a real, central overview of each building’s consumption for the first time, the basis for fair cost allocation instead of a flat rate. The solution was installed without disrupting the apartment buildings and is ready to scale to further buildings and utilities. Metering is the first step; the platform makes it possible to build further on it.
Want to see the real consumption of your operation? We start with a site visit and a no-obligation quote. A pilot project on one building proves the benefit before you decide on full deployment.