# Smart metering project at Grassalkovich Palace

Client

Presidential Palace building of national importance

Project goal

Sub-metering for the individual parts of the building

7

Metering points

28

Devices installed

[Case study · Public sector Electricity sub-metering at the Presidential Palace Read the case study](https://www.nidextechnology.com/en/references/public-sector)

How it is connected

## Solution diagram

Simplified diagram based on the project description.

- 01 · Metering Seven three-phase analysers in the switch room and around the building Electricity **7** metering points **28** devices installed
- 02 · Transfer Modbus over the operator’s private APN
- 03 · Data collection Revolution Pi: local aggregation and visualisation
- 04 · Network Private mobile network
- 05 · System Higher-level monitoring system Consumption visualisation Forecast

On site

## Photos from the project

6 shots straight from the installation.

## Project summary

- Sub-metering
- Integration for individual parts of the building
- Modbus RTU

Our company took part in delivering a smart electricity metering system in the representative rooms of Grassalkovich Palace, the seat of the President of the Slovak Republic. The primary aim of the project was to build a modern, reliable energy monitoring system for detailed tracking of consumption and the key parameters of the electrical network. The project was also designed to meet strict security requirements and to respect the particular constraints of a historic building.

## Implementation

- Revolution Pi
- Consumption visualisation
- Teltonika
- Forecast

The solution was based on installing seven Selec three-phase electricity analysers, which provide accurate measurement of voltage, current, active and reactive power and power factor. Some analysers were fitted in the main switch room, and others were installed directly in the palace’s rooms to cover all significant supply points. The devices were connected using the Modbus communication protocol, with a peer-to-peer architecture within a mobile operator’s private APN. This technology was chosen as the best solution in an environment where running new communication cables was severely limited and a wireless Wi-Fi network was out of the question because of security risks.

For data processing, an industrial Revolution Pi edge controller was deployed, which aggregates and visualises the measured values locally. The measured data is transferred to the higher-level monitoring system by Teltonika communication units, which use a secure data connection in Telekom’s private mobile network. The whole system was completed with protection and power components, including protective devices, terminal blocks and neatly routed supply circuits. The cabling was run in cable trays, with an emphasis on unambiguous labelling of all conductors and components, which makes future management and maintenance easier.

## Results

- 7 metering points
- 28 electrical devices installed
- Successful networking and stable communication
- Real-time electricity metering

The project created a fully functional, secure and technologically modern smart electricity metering system. The new infrastructure allows accurate, continuous tracking of consumption in the individual parts of the building, gives the operator reliable data for optimising energy management and supports transparency in managing operating costs. The project successfully combined the historic character of the building with state-of-the-art metering and data transmission technology, creating a system that meets the demands of long-term reliable operation and is a significant step towards more efficient energy management of a building of national importance.

Public sector

## More projects in the segment

[Next project: Energy monitoring at transformer station level](https://www.nidextechnology.com/en/references/public-sector/energeticky-monitoring-na-urovni-trafostanic)

[Public sector Energy monitoring at transformer station level Agrokomplex Nitra · exhibition grounds, state sector 16 pts · 32 pcs](https://www.nidextechnology.com/en/references/public-sector/energeticky-monitoring-na-urovni-trafostanic)

[All projects in Public sector](https://www.nidextechnology.com/en/references/public-sector#projekty)

Continue to another segment

Contact

## Want a similar result at your site?

We start with a site visit and a no-obligation quote. A pilot project on one building proves the benefit before you decide on full deployment.

- [No-obligation consultation](https://cal.com/nidextechnology/consultation)

Write to us

[office@ nidextechnology.com](mailto:office@nidextechnology.com?subject=No-obligation%20consultation)

For clients and partners

- Mgr. Denis Hriň Co-founder [hrin@ nidextechnology.com](mailto:hrin@nidextechnology.com) [+421 905 134 635](tel:+421905134635)
- Ing. Nicolas Hečko Co-founder [hecko@ nidextechnology.com](mailto:hecko@nidextechnology.com) [+421 904 418 299](tel:+421904418299)

**Nidex Technology s.r.o.** Novozámocká 55/58, 949 05 Nitra, Slovakia

- [LinkedIn](https://www.linkedin.com/company/nidextechnology/)
- [Facebook](https://www.facebook.com/Nidextechnology)
- [Instagram](https://www.instagram.com/nidextechnology/)