Case study · Public sector

# Electricity sub-metering at the Presidential Palace

The Presidential Palace (Grassalkovich Palace) needed a modern, reliable energy monitoring system to track consumption and the key parameters of its electrical network in detail. The solution had to meet strict security requirements and respect the particular constraints of a historic building.

Project result

7 analysers

Sub-metering at the Presidential Palace

Client

Presidential Palace

Sector

Public sector

Goal

Sub-metering for the individual parts of the building

Utility

Electricity: main switch room and supply points

Technology

7× three-phase energy analyser, Modbus, private APN, edge controller

Starting point

## We understand the segment's challenges

Where costs and risks really arise in this environment, and why you cannot see them without metering.

01

### Strict security requirements

The solution at the Presidential Palace had to meet strict security requirements. A wireless Wi-Fi network was out of the question.

02

### Historic building, limited cabling

Running new communication cables in a significant historic building was severely limited, with no interference with its historic fabric.

03

### No sub-metering by part of the building

Without sub-metering, it was impossible to track the consumption of individual parts of the building or the key network parameters.

04

### Demands on metering accuracy

The building requires accurate measurement of voltage, current, active and reactive power and power factor at all significant supply points.

Project scope

## What we deployed on the project

- 7 three-phase electricity analysers
- Some in the main switch room, others directly in the building’s rooms
- Coverage of all significant supply points
- Modbus communication, peer-to-peer architecture in a private APN
- Industrial edge controller: local aggregation and visualisation
- Data transfer to the higher-level monitoring system

From the project: the Presidential Palace

How it is connected

## Solution diagram

Simplified diagram based on the project description.

- 01 · Metering Seven three-phase analysers in the switch room and around the building Electricity **7** metering points **28** devices installed
- 02 · Transfer Modbus over the operator’s private APN
- 03 · Data collection Revolution Pi: local aggregation and visualisation
- 04 · Network Private mobile network
- 05 · System Higher-level monitoring system Consumption visualisation Forecast

Results · real data from the deployment

## Measurable impact

The figures come straight from the deployed monitoring and analytics system.

7

Three-phase analysers

100%

Of significant supply points covered

APN

Private network instead of Wi-Fi

Online

Real-time consumption overview

Accurate measurement of voltage, current, active and reactive power and power factor

Sub-metered consumption by individual part of the building

A secure solution with no interference with the building’s historic fabric

Data for transparent control of the Presidential Palace’s consumption

Concrete benefits · real findings

## What the system delivered in practice

### Metering without interfering with a historic building

A private APN and peer-to-peer Modbus replaced both the impossible new cabling and Wi-Fi, which was unacceptable for security reasons. The installation respected the historic fabric of the Presidential Palace.

### An accurate overview of key network parameters

Three-phase analysers measure voltage, current, active and reactive power and power factor at all significant supply points: the basis for transparent control of consumption.

Your challenges · our answers

## What it means for a public building manager

The Presidential Palace, with strict security requirements

A private APN instead of Wi-Fi, secure data transfer

Limited cabling in a historic building

Peer-to-peer Modbus over APN, no interference with the historic fabric

No sub-metering by part of the building

7 energy analysers at all significant points

A need for accurate network parameters

Measurement of U, I, active and reactive power and power factor

Why Nidex Technology

## Four reasons, each proven in practice

### End-to-end responsibility

From design, hardware supply and installation to data integration, inspections and support. One supplier, one point of responsibility.

### Technical precision and standards

We design in line with the Slovak standards STN 33 2000 and STN EN 61439. We issue statutory inspection and test reports (OPOS) with our own staff.

### References in regulated environments

Healthcare, industry, state infrastructure: environments with higher demands on accuracy and reliability.

### Based in Central Europe

We are based in Nitra, Slovakia, about two hours from Vienna and Budapest, and know the local legislation. Fast response, one team from design to service.

Proposed next steps

## Three steps from a meeting to the first results

- 01 Technical meeting A visit to the selected building. We define the scope, priority locations and constraints.
- 02 Indicative quote An indicative price based on the agreed scope. Presentation of the technical design.
- 03 Pilot project Deployment in one building. Verifying functionality, integration and training the operators.

Conclusion

## Why it makes sense

The energy monitoring project at the Presidential Palace showed that modern sub-metering can be deployed even in the most sensitive public sector buildings: safely, without interfering with the historic fabric and with full accuracy. Nidex Technology delivered a turnkey solution, from design and installation to data integration, which gives the building manager a transparent overview of the Presidential Palace’s consumption.

**Want to see the real consumption of your operation?** We start with a site visit and a no-obligation quote. A pilot project on one building proves the benefit before you decide on full deployment.

[Projects in Public sector](https://www.nidextechnology.com/en/references/public-sector#projekty)

## Projects in the segment · 2

[Case study Public sector Smart metering project at Grassalkovich Palace Presidential Palace · building of national importance 7 pts · 28 pcs](https://www.nidextechnology.com/en/references/public-sector/projekt-inteligentneho-merania-v-grasalkovicovom-palaci) [Public sector Energy monitoring at transformer station level Agrokomplex Nitra · exhibition grounds, state sector 16 pts · 32 pcs](https://www.nidextechnology.com/en/references/public-sector/energeticky-monitoring-na-urovni-trafostanic)

Continue to another segment

Contact

## Want a similar result at your site?

We start with a site visit and a no-obligation quote. A pilot project on one building proves the benefit before you decide on full deployment.

- [No-obligation consultation](https://cal.com/nidextechnology/consultation)

Write to us

[office@ nidextechnology.com](mailto:office@nidextechnology.com?subject=No-obligation%20consultation)

For clients and partners

- Mgr. Denis Hriň Co-founder [hrin@ nidextechnology.com](mailto:hrin@nidextechnology.com) [+421 905 134 635](tel:+421905134635)
- Ing. Nicolas Hečko Co-founder [hecko@ nidextechnology.com](mailto:hecko@nidextechnology.com) [+421 904 418 299](tel:+421904418299)

**Nidex Technology s.r.o.** Novozámocká 55/58, 949 05 Nitra, Slovakia

- [LinkedIn](https://www.linkedin.com/company/nidextechnology/)
- [Facebook](https://www.facebook.com/Nidextechnology)
- [Instagram](https://www.instagram.com/nidextechnology/)